JPT Topics

SPE.org 

The Anchor development in the US Gulf of Mexico is the first ultra-high-pressure project requiring 20-ksi operating pressure to reach a final investment decision. This paper discusses the successful application of managed-pressure drilling (MPD) in the basin with reduction in risks and well costs. This paper discusses how managed-pressure-drilling (MPD) technology led to cost savings in two wells drilled in the Hai Thach gas field offshore southern Vietnam. We must concentrate our paper selection on technology and operating methods that make HP/HT drilling operations faster, safer, and more cost-efficient. If above-threshold drilling costs shelve a project, the project will not fly.

Duplicate Docs Excel Report

Title
None found