OGF Tags

SPE.org 

Logistical work is taking place in advance of subsea installation activities, which have the large UK North Sea field on track for first oil in 2019. After severe damage in a typhoon, the Huizhou oil field in the South China Sea was back on production in 5.5 months. This paper reviews how this feat was accomplished.

  Country:
  Industry: Energy > Oil & Gas > Upstream (1.00)

Duplicate Docs Excel Report

Title
None found

Similar Docs  Excel Report  more

TitleSimilarity
None found