JPT Tags

SPE.org 

Completion engineers feel pressure to maximize production per acre and minimize the downsides of fracturing in tight spaces. Terry Palisch, talks about promoting knowledge sharing as part of JPT’s tech director report. Good diagnostic testing is often painstaking, time-consuming, and costly, but recent studies suggest that a lack of knowledge can be even costlier. Good reservoir detective work costs money, but two studies show how it can help identify even more expensive problems.

  Industry: Energy > Oil & Gas > Upstream (1.00)
  Oilfield Places: North America > United States > Texas > Permian Basin > Midland Basin > Good Field (0.98)