JPT Tags

SPE.org 

In this work, the authors developed a numerical model of in-situ upgrading (IU) on the basis of laboratory experiences and validated results, applying the model to an IU test published in the literature. Unconventional development has made it clear to Erdal Ozkan that conventional theory overlooks a lot of potentially productive rock. He talks about looking for ways to do better as part of JPT’s tech director report. Completion engineers feel pressure to maximize production per acre and minimize the downsides of fracturing in tight spaces. Terry Palisch, talks about promoting knowledge sharing as part of JPT’s tech director report.