JPT Tags

SPE.org 

The well will immediately be brought on production and is expected to flow at more than 100 MMscf/D of gas and 3,000 B/D of associated condensate, the company said. The French major is racking up barrels of deepwater production as part of its large-scale West African push. Since 2007, an operator in Nigeria has registered a significant increase of oil-spill events caused by sabotage and oil-theft activities. The technology presented here allows detecting and locating leaks taking place at a distance from the sensor of up to 35 km.