JPT After-Closure Analysis of DFITs Drives Design of Hydraulic-Fracturing Programs

SPE.org 

The Khazzan field is being developed currently and includes multiple gas-bearing formations. The primary development reservoir is the Barik sandstone, which is characterized by permeabilities on the order of 0.1 to 1 md. An additional reservoir under development is the Amin formation, which lies deeper than the Barik and is perhaps more unconventional in nature, with estimated permeabilities an order of magnitude lower than the Barik formation. Both reservoirs require hydraulic fracturing to produce at economically attractive rates and, as such, carry the same sort of challenges to reservoir understanding inherent to all unconventional plays. This was recognized in advance of the appraisal program, and an approach was taken to address these challenges in a more-holistic fashion, encompassing a full suite of data gathering, including surveillance and well testing. One of the key tools used was DFIT along with associated ACA of the decline to determine reservoir properties. During the appraisal phase, significant rigor was aimed at ensuring high-quality data would be recorded and that an appropriate amount of time would be allocated to monitoring pressure declines to enable valid interpretations. This resulted in the ability to draw a good correlation between data gathered from the ACA operations and data collected from post-fracturing well-test data.