JPT Managed-Pressure Cementing: Successful Deepwater Application

SPE.org 

The case in this paper is an exploratory well drilled at a water depth of 1700 m in the Caribbean Sea. Well 1 was designed to drill through a potential shallow gas interval directly below a 22‑in.