JPT Tags

SPE.org 

This paper discusses the first multilateral well with a Level-4 junction combined with an inflow-control device (ICD) planned, designed, and drilled in the Upper Burgan reservoir of Raudhatain field, north Kuwait. Several designs for autonomous inflow-control devices (AICDs) are available. The comparative properties and abilities of these designs are the focus of this paper. As part of a project that involves the use of four artificial islands to drill and complete more than 300 extended-reach-drilling (ERD) wells in a giant offshore oil field, several completion designs have been piloted for brownfield development.