Layer | Fill | Outline |
---|
Theme | Visible | Selectable | Appearance | Zoom Range (now: 0) |
---|
Fill | Stroke |
---|---|
You must log in to edit PetroWiki. Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. A small diameter tubing string, often coiled tubing that is suspended inside the existing production tubing. By occupying part of the flow path space, the velocity of the produced fluid is increased and the potential to lift water from the well is increased.
You must log in to edit PetroWiki. Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. A tubing specific relationship that is plotted with the IPR curve to select the tubing size for the well.
You must log in to edit PetroWiki. Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. In the context of tubing, tangential stress are stresses around the body of the tubing (Hoop Stresses).
You must log in to edit PetroWiki. Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. A section, usually pressurized and capable of being opened, below a coiled tubing injector where larger tool can be added or removed to the CT (coiled tubing) BHA (bottom hole assembly).
You must log in to edit PetroWiki. Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. A short section with external seals on the end of tubing to stab into a polished bore receptacle and achieve a seal. The seal assembly may be allowed move in the PBR when tubing temperature and/or pressure changes.