Goto
No map tile layer
Layer | Fill | Outline |
---|
Map layers
Theme | Visible | Selectable | Appearance | Zoom Range (now: 0) |
---|
Fill | Stroke |
---|---|
Collaborating Authors
Results
This paper was prepared for presentation at the 1999 SPE/ICoTA Coiled Tubing Roundtable held in Houston, Texas, 25–26 May 1999.
abrasive material, asphaltene inhibition, asphaltene remediation, BPM, coiled tubing, completion equipment, Completion Installation and Operations, CT speed, downhole intervention, drift ring, fishing neck, hydrate inhibition, Hydrate Remediation, intervención de pozos petroleros, log analysis, mandrel, nozzle head, oilfield chemistry, paraffin remediation, particle, Petroleum Engineer, Production Chemistry, production enhancement, remediation of hydrates, scale deposit, scale inhibition, scale remediation, side pocket mandrel, software, spe 54477, Upstream Oil & Gas, valve, wax inhibition, wax remediation, Well Intervention, well logging
SPE Disciplines: